sjoens Posted July 9, 2023 Share Posted July 9, 2023 (edited) Request ability to Shrink/Stretch grouped PRV notes by Ctrl+Shift+Dragging both ends of the notes, like you can with Track View clips. Currently you Shrink/Stretch grouped PRV notes by Ctrl+Dragging either end of the notes. This works but is confusing when working between views. BTW, Shift+Dragging grouped notes makes them all the same length and only works on the left end of the group. EDITED Edited July 9, 2023 by sjoens Link to comment Share on other sites More sharing options...
OutrageProductions Posted July 9, 2023 Share Posted July 9, 2023 (edited) I do something like that often by using <N> (snap to grid off) then pull/push the beginning of the notes L/R. But only if I'm really opting to mess with timing or attack. Edited July 9, 2023 by OutrageProductions Link to comment Share on other sites More sharing options...
sjoens Posted July 9, 2023 Author Share Posted July 9, 2023 (edited) I see. Shift has nothing to do with it. Simply holding Ctrl while dragging does work on both ends of the notes. Thanks. I was confused because holding Ctrl+Shift worked on the left ends but not the right ends, so it was probably just ignoring the Shift key. Shift+Dragging the left end of a group of notes makes all the notes the same duration. Shift+Dragging the right end is ignored. It would be nice if the routines were similar for both Views, so I'm changing the request to reflect that. Edited July 9, 2023 by sjoens Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now