Jump to content

EastWest Opus updated to 1.5.3 , Installation Center updated


BTP

Recommended Posts

Run Installation Center to update.

Opus 1.5.3 / Aug 26, 2024

On demand download in DAW project - improved

On demand download (standalone/ plugin) - improved

On demand download in background (cloud symbol) - fixed

On demand download in DAW projects with Orchestrator patches - fixed (requires Orchestrator to be installed)

Hanging notes when holding sustain pedal and stopping playback in Pro Tools - fixed

Resize Player when detached - new feature

Startup Wizard on windows - fixed

Tempo Sync for Orchestrator - fixed

IC 1.5.0 / Aug 26, 2024

Maintenance update

  • Like 1
  • Thanks 1
Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
×
×
  • Create New...